COMPLETE OPEN END SPINNING PLANT With 2400 Schlafhorst SE12 Spinboxes

C10 7935

This polant is running now and currently spinning100% Viscose and cotton/Pes blends .

Also produced 100% Viscose , 100% cotton , 100%Polyester,cotton/Polyester, Polyester /Viscose blends.

All available style change components are included.

 

With an average Ne 20/1 oe, 21-22 tons/day production is obtained.

 

Trutzschler Blow Room Line 1

Blendomat Bale Opener BDT019-2300

EMA,BOA 1600, Axiflo,MPM 10/1400 Multimixer,

CVT1600, CVT4, Dustex (all1996)

FDO1600,CL C4 Cleanomat, SP-DX Dustex (all 2006-7)

 

Blow Room Line 2

Blendomat Bale Opener, BDT019-2300

SP-MF, CL-P, BR-CO, MX1-10,CL-C4 Cleanomat,

SPF foreign particle separator, (all 2004)

 

Trutzschler Cards

7 DK760 Cards 1996

8 DK803 Cards 1996

2 DK903 Cards 2001

 

Rieter Draw Frames

5 Rieter SB D40 Draw Frames (2x2006; 3x2009)

5 Rieter RSB D40 Draw Frames (2x2006; 3 x 2009)

 

Schlafhorst Open End Spinning Frames

3 Frames, 288 rotors, SE9 spinbox, total 864 rotors1996

   with Corolab QD, 2 robots, 4deg20’, doffer

2 Frames, 312 rotors, SE11 spinbox,total 624 rotors 2002

   with Corolab QD, 2 robots, 4deg20’, robot LU

5 Frames, 480 rotors, SE12 spinbox,total 2400 rotors 2007

   with Corolab XQ, 4 robots, cylindrical, robot LU

© 2018 Proudly created with Net-workedcouk Ltd